64. The operator must inspect on a monthly basis the primary element and on a weekly basis the secondary element of each flow measurement system. The operator must keep a log of the inspections and repairs performed and retain it for a minimum of 5 years after the date of the inspection.
The log provided for in the first paragraph must be provided to the Minister at the Minister’s request within the time indicated.
O.C. 808-2007, s. 64; 994-2023O.C. 994-2023, s. 411.